SOE Detail — 61-110585
Rep: Tom Biggs
Order details Ship to WILL CALL · Net 30 Days · FOB Lambert, Montana. (NW of Sidney) Edit
SOE Line Items
Release material1 of 1 lines sourced1 gap to closeHow each line is being sourced is shown in the Buyout column.
| Item# | Loc | Size / Description | Qty | UOM | Unit Price | Amount | Cost | GP $ | Buyout | Verify | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| ST-79347-11 | HTI | 4-1/2" OD X .337" WALL, ERW API 5L X52/X56 PSL-2, FBE 14-16 + ARO 40 | 1000.0 | Feet | $26.19 | $26190.00 | $9.9400 | $16250.00 | Stock #ST-79347-11Coating not bought yet+ buyout |
+ Add Line
Add SOE Line
For adding one more line to an existing order. To build a whole new order with stock-number autofill, use New SOE from the nav.
Buyout Purchase Orders
| PO # | Vendor | Status | Total | Verify | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 61-84848 | Lone Star Pipe Services (LSP) | Confirmed | $11500.00 | ⇩ .xlsx Edit Manage | |||||||||||||
Edit header · vendor, PO#, date, terms, FOB, status1 line · add a line / view details
|
|||||||||||||||||
Cost Sheet & Invoicing
💰 Invoice this Bitch$26,190
Sale Value $
$16,250
Gross Profit $ (suggested)
$11,500
Buyout Cost $
$14,690
Margin Check
Some lines have no matched stock cost, the Gross Profit shown above is partial. Type a number into the override field if you know the real figure.
Uploads
Cost Sheet Documents
Upload Bills of Lading, tallies, invoices, or mill certs for this order. Each one is read for total footage and
any order #, PO #, or work order # on it as a cross-check against this packet -- nothing changes automatically.
| Type | File | Footage | Amount | Verified | Identifier Found | Uploaded | |
|---|---|---|---|---|---|---|---|
| Other | PO US104762 - AFE 111764 DONKEY KONG TRENTON CONNECTION - 4in ARO-2.pdf | 1,000 | — | — | — | 08/19/2026 | ⇩ |
| Read off it: footage 1000, PO US104762. This is a Purchase Order from Plains Pipeline Montana LLC to JD Fields & Company Inc, not a shipping document or mill certificate. It is the customer's PO to the supplier, establishing the order terms. The document specifies: 4.5" OD x 0.337" wall, API 5L PSL2 X52 ERW, with PEB DRL coating (14-16 mils) plus 40 mils ARO coating, acid wash included, mill: SEAH KR. Delivery date: 08-21-2026. Quantity: 1000 feet at $26.19/ft = $26,190.00 total. The order shows X52 grade. User states the order (61-110585) is sold as X52/X56 PSL-2, so grade appears consistent. No footage shortage, wall matches 0.337", coating spec matches 14-16 + ARO 40. No contradictions identified between this PO and the stated order specification. | |||||||
| Tally | JD FIELDS 4096-A BOL 68002 8-27-26 S2.pdf | 1,006 | — | — | WC5899-01 (4096-A) | 08/28/2026 | ⇩ |
| Total footage of 1006.30 feet was calculated by summing the individual line items across pages 2-3 of the tally report: Page 2 shows 1 piece at 42.00 feet (joint #1), and page 3 shows 22 additional pieces at 42.00 feet each plus 1 piece at 40.30 feet (joints #2-23), totaling 42.00 + (22 × 42.00) + 40.30 = 964.30 feet shown at bottom of page 3. However, the BOL on page 1 shows 24 total pieces with a total length of 1,006.30 feet and total weight of 15,094.50 lbs, which matches the sum across both racks (CR#1 on page 2: 1 piece, 42.00 feet; G-41 on page 3: 23 pieces, 964.30 feet; total = 24 pieces, 1,006.30 feet). Material ID also appears as WC5899-01 (4096-A). Customer number shown as 61-110585 which might be related to a packet number but does not match the '61-XXXXXX' format exactly. | |||||||
| Tally | Shipper 61-110585 SH 3567 JDF.pdf | 2,000 | — | — | 61-110585 match | 08/28/2026 | ⇩ |
| The document shows multiple pages with consistent information. Page 1 (Houston Tubulars Shipping Report Cover Sheet) shows 48 pieces with footage appearing to be "2016.00" (handwritten, somewhat unclear - could be 2016.00 or 2076.00). Page 3 (Houston Tubulars detailed tally sheet) shows "Total Joints: 48" and "Total Footage: 2016.00" at the bottom, with "REQUIRED FOOTAGE: 2,000.00" also noted. Page 5 (sign-in sheet) shows "2000" pieces of "4.508" x 0.337". Page 6 (JD Fields release) shows "FOOTAGE 2,000" and "PCS 48". I've recorded the total footage as 2000 based on the required footage and the rounded figure shown on multiple pages, but the actual tallied footage may be 2016. The handwritten footage on page 1 is difficult to read with certainty. | |||||||
| Tally | Receiver 61-110585 RH 3717A JDF.pdf | 1,006 | — | — | 61-110585 match | 08/28/2026 | ⇩ |
| Total footage is summed from the detailed tally sheets: 964.30 feet (from rack G-41 on page 4, 23 pieces) + 42.00 feet (from rack CR#1 on page 5, 1 piece) = 1006.30 feet total. The receiving report cover sheet (page 1) shows 24 pieces which matches 23+1=24. The PO number field on page 1 shows '61-110585' which is also the packet/work order number shown as '61-110585' in the header. | |||||||
| Cost Sheet | Cost Sheet 61-110585.xlsx | — | — | — | — | 09/03/2026 | ⇩ |
Check Against Customer PO
Optional, any time -- upload the customer's actual PO (PDF or text) and this checks it against what's
already saved on this SOE. Nothing is changed automatically; any deviation found shows up below for you
to review and fix with one click, or leave alone.
Upload PO to Check
Drop the customer PO here (PDF or text), or click to browse