JD Fields & Company
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
61-110519Complete
Maverick International
Customer PO 4066575 · <Salesperson 61 Tom Biggs> · FOB Houston, TX
Est ship
08/11
23 days past
Order value
$4K
2 SOE lines
Quoted GP
$1K
26.8% quoted
Buyout cost
$0
across 0 POs
Docs verified
0 of 2
2 still to check
SOE entered
Material secured
PO issued
PO emailed
Released to coater / fab
Shipped to job
Tallied & invoiced
SOE Detail — 61-110519
Rep: Tom Biggs
Bill Complete
✉ Email SOE (Outlook) + New Buyout PO
Order details Ship to WILL CALL · NET 30 · FOB Houston, TX Edit

SOE Line Items

Release material
2 of 2 lines sourcedHow each line is being sourced is shown in the Buyout column.
Item#LocSize / DescriptionQtyUOMUnit PriceAmountCostGP $BuyoutVerify
SRL-81903-64 HTI12-3/4" OD X .375" WALL, ERW API 5L X65 PSL-2 20.0 Feet$45.14 $902.80 $28.5200
$332.40 Stock #SRL-81903-64+ buyout
SRL-70243-02 HTI16" OD X .500" WALL, ERW API 5L X65, PSL-2 41.42 Feet$83.00 $3437.86 $62.9800
$829.23 Stock #SRL-70243-02+ buyout
+ Add Line

Add SOE Line

For adding one more line to an existing order. To build a whole new order with stock-number autofill, use New SOE from the nav.

Buyout Purchase Orders

No buyout POs on this packet yet. Use "+ New Buyout PO" above to create one.

Cost Sheet & Invoicing

✓ Fully verified
Every stock line, buyout PO, and costed document on this packet has a confirmed cost and footage. Ready to bill.
💰 Invoice this Bitch
$4,341
Sale Value $
$1,162
Gross Profit $ (suggested)
$0
Buyout Cost $
$4,341
Margin Check
+ New Buyout PO

Uploads

Cost Sheet Documents

Upload Bills of Lading, tallies, invoices, or mill certs for this order. Each one is read for total footage and any order #, PO #, or work order # on it as a cross-check against this packet -- nothing changes automatically.
Upload Document
Drop a BOL, tally, invoice, or mill cert here (PDF or text), or click to browse
TypeFileFootageAmountVerifiedIdentifier FoundUploaded
Freight / BOL Shipper 61-110519 SH 3452 JDF.pdf 62 08/11/2026
Read off it: footage 61.52, order number 61-110519, work order SH 3452. This is a Houston Tubulars shipping package for release 61-110519. The documents include: 1) Shipping Report Cover Sheet (page 1) listing two line items with a combined FOOTAGE discrepancy: shows 20.00 + 41.52 = 61.52 ft total 2) Straight Bill of Lading (page 2) showing Release# 61-110519 dated 8/11/2026, carrier 3452, consigned to JD Fields & Company, describing two items: 12.750 x 0.375 SRL X65 BPE AXIS and 16.000 x 0.500 SRL X65 BPE TUBERIA LAGUNA, with "Packages" column showing "2" 3) Mill tally sheets from Houston Tubulars (pages 3-4): - Page 3: 12.750 x 0.375, 49.61#, X65, AXIS, SRL, 1 piece x 20.00 ft, Heat# 3008893, M/V WO16392, Rack X1-03, Item SRL-81903-64, Required Footage 20.00, Total Footage 20.00 - Page 4: 16.000 x 0.500, 82.85#, X65, TUBERIA LAGUNA, SRL, 2 pieces (20.43 + 20.89), Total Footage 41.52, Heat# 2034126 & 2034426, M/V JDF-HTI GROUP 8, Rack G-04, Item SRL-70243-02, Required Footage 40.00 4) Email from Tom Biggs dated 8/10/2026 with subject "Release 61-110519" confirming the two line items with item numbers SRL-81903-64 and SRL-70243-02 5) Houston Tubular Sign In Sheet dated 8/11/26, release 61-110519, Maverick truck #3, listing piece count 20 pcs 12" SRL (375") API 5L PSL & X65 and 40 pcs 16" SRL (500") API 5L PSL X65 6) JD Fields internal release document (page 7) for release 61-110519 dated 4-306-200, showing the same two items with piece counts 2 and 40, footages 20 and 40 DISCREPANCIES: 1. FOOTAGE SHORT on 16" line: The order called for 40.00 ft of 16" OD x 0.500 wall (per page 4 "Required Footage: 40.00"), but the actual shipped footage is 41.52 ft (1.52 ft over). 2. PIECE COUNT DISCREPANCY: The sign-in sheet (page 6) lists "20 pcs 12" SRL" and "40 pcs 16" SRL", but the actual mill tallies show only 1 piece of 12.750 and 2 pieces of 16.000. This is a significant discrepancy that suggests either a transcription error on the sign-in sheet or confusion about what was actually loaded. GRADE CONFIRMATION: Both lines show X65 on all documents, matching the order specification. No grade discrepancy. WALL/SIZE CONFIRMATION: 12.750 x 0.375 and 16.000 x 0.500 match the order specification exactly. MILL: Two different mills supplied material (AXIS for 12.750, TUBERIA LAGUNA for 16.000). HEAT NUMBERS documented: 3008893 (12.750 line), 2034126 & 2034426 (16.000 line). ITEM/CERT NUMBERS: SRL-81903-64 (12.750 line), SRL-70243-02 (16.000 line).
Cost Sheet Cost Sheet 61-110519.xlsx 09/03/2026

Check Against Customer PO

Optional, any time -- upload the customer's actual PO (PDF or text) and this checks it against what's already saved on this SOE. Nothing is changed automatically; any deviation found shows up below for you to review and fix with one click, or leave alone.
Upload PO to Check Drop the customer PO here (PDF or text), or click to browse
{} {} {} {}