Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Cost Sheet Review โ 61-110697
Northern Natural Gas Company
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the
cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again
to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not
everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.
Selling Price (2 lines)
| # | Item / Description | Qty (Footage) | Unit Price | Amount | Footage |
|---|---|---|---|---|---|
| 1 | ST-76399-07 โ 36" OD X .625" WALL, SAW API 5L X70, FBE 14-16 | 82.5 | $447.8900 | $36950.92 | |
| 2 | FREIGHT โ TEAM DRIVERS FREIGHT - EXPEDITED 1100 MILES PICK UP 8/27 DELIVERY 8/29 @ 1:00 PM | 1.0 | $3375.0000 | $3375.00 |
Cost Items
Stock pulled from inventory
| Item # | Description | Feet | Cost | Confirm |
|---|---|---|---|---|
| ST-76399-07 | 36" OD X .625" WALL, SAW API 5L X70, FBE 14-16 | 82.5 | $224.5300 | |
| FREIGHT | TEAM DRIVERS FREIGHT - EXPEDITED 1100 MILES PICK UP 8/27 DELIVERY 8/29 @ 1:00 PM | 1.0 | $3425.0000 |
Buyout purchase orders
No buyout POs on this packet.
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.