JD Fields & Company
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Cost Sheet Review โ€” 61-110697

Northern Natural Gas Company

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.

Selling Price (2 lines)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 ST-76399-07 โ€” 36" OD X .625" WALL, SAW API 5L X70, FBE 14-16 82.5 $447.8900 $36950.92
2 FREIGHT โ€” TEAM DRIVERS FREIGHT - EXPEDITED 1100 MILES PICK UP 8/27 DELIVERY 8/29 @ 1:00 PM 1.0 $3375.0000 $3375.00

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
ST-76399-07 36" OD X .625" WALL, SAW API 5L X70, FBE 14-16 82.5 $224.5300
FREIGHT TEAM DRIVERS FREIGHT - EXPEDITED 1100 MILES PICK UP 8/27 DELIVERY 8/29 @ 1:00 PM 1.0 $3425.0000
Buyout purchase orders
No buyout POs on this packet.
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
{} {} {} {}