JD Fields & Company
Cost Sheet template is full -- 2 cost item(s) didn't fit and were left off. Add them by hand in Excel.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Cost Sheet Review — 61-110168

KM LA HAYNSVILLE HEADER PL LLC

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
1 item still needs confirmation
Click each amber badge below as you check it against the real paperwork.

Selling Price (1 line)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 ST-82159-01 — 20" OD X .375" WALL, ERW API 5L X65, PSL-2 4015.5 $80.9500 $325054.73

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
ST-82159-01 20" OD X .375" WALL, ERW API 5L X65, PSL-2 4015.5 $60.0000
Buyout purchase orders
PO #VendorLinesTotal CostConfirm
61-84626 Jindal SAW USA LLC 1 $24012.69
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
1 item above still is unconfirmed.
💰 Invoice this Bitch
{} {} {} {}