Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Cost Sheet Review โ 61-110676-AAA
Northern Natural Gas Company
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the
cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again
to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not
everything above is checked.
2 items still need confirmation
Click each amber badge below as you check it against the real paperwork.
Selling Price (1 line)
| # | Item / Description | Qty (Footage) | Unit Price | Amount | Footage |
|---|---|---|---|---|---|
| 1 | Buyout โ 24" OD X .375" Wall API 5L Grade X65, FBE 14-16 | 40.0 | $163.3000 | $6532.00 |
Cost Items
Stock pulled from inventory
| Item # | Description | Feet | Cost | Confirm |
|---|---|---|---|---|
| Buyout | 24" OD X .375" Wall API 5L Grade X65, FBE 14-16 | 40.0 | โ |
Buyout purchase orders
| PO # | Vendor | Lines | Total Cost | Confirm |
|---|---|---|---|---|
| 61-84938 | Weiler Pipe LLC | 1 | $5600.00 |
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
2 items above still are unconfirmed.
💰 Invoice this Bitch