JD Fields & Company
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Cost Sheet Review — 61-110718

ECI Contracting

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
3 items still need confirmation
Click each amber badge below as you check it against the real paperwork.

Selling Price (2 lines)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 buyout — 24” XH Weld Cap, Grade Y65 1.0 $3390.0000 $3390.00
2 FRT — FREIGHT 1.0 $1200.0000 $1200.00

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
buyout 24” XH Weld Cap, Grade Y65 1.0
FRT FREIGHT 1.0 $1000.0000
Buyout purchase orders
PO #VendorLinesTotal CostConfirm
61-84974 Maverick International, Ltd. 1 $2895.00
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
3 items above still are unconfirmed.
💰 Invoice this Bitch
{} {} {} {}