JD Fields & Company
Cost Sheet template is full -- 2 cost item(s) didn't fit and were left off. Add them by hand in Excel.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Cost Sheet Review — 61-110716

Weiler Pipe LLC

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.

Selling Price (1 line)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 ST-82628-01 — 8-5/8" OD X .500" WALL, ERW API 5L X52 PSL2 800.0 $38.7600 $31008.00

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
ST-82628-01 8-5/8" OD X .500" WALL, ERW API 5L X52 PSL2 800.0 $30.7700
Buyout purchase orders
No buyout POs on this packet.
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
{} {} {} {}