JD Fields & Company
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Cost Sheet Review — 61-109448-1

Northern Natural Gas Company

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.

Selling Price (1 line)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 BO — 16" OD x 0.375W X65 FBE 14-16 MILS, FBE 14-16 89.6 $200.0000 $17920.00

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
BO 16" OD x 0.375W X65 FBE 14-16 MILS, FBE 14-16 89.6 $78.0000
Buyout purchase orders
PO #VendorLinesTotal CostConfirm
61-83627-AB Weiler Pipe LLC 1 $6988.80
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
{} {} {} {}