Cost Sheet Review — 61-110330
Plains Oryx Permian Basin Pipeline LLC
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the
cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again
to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not
everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.
Selling Price (2 lines)
| # | Item / Description | Qty (Footage) | Unit Price | Amount | Footage |
|---|---|---|---|---|---|
| 1 | ST-79347-11 — 4-1/2" OD X .337" WALL, ERW API 5L X52/X56 PSL-2, FBE 14-16 | 126.0 | $89.8900 | $11326.14 | |
| 2 | Pipe, line, TRANSITION -4.500 x 0.337 transitioned to 0.237 API5L PSL2 X52 ERW PEB SRL (10' in length) with 14-16 mils FBE inclusive of Acid Wash - taper bored at an angle between 1:4° minimum (1:4 slope) and 30° Maximum SEAH, KOREA | 120.0 | $89.8900 | $10786.80 |
Cost Items
Stock pulled from inventory
| Item # | Description | Feet | Cost | Confirm |
|---|---|---|---|---|
| ST-79347-11 | 4-1/2" OD X .337" WALL, ERW API 5L X52/X56 PSL-2, FBE 14-16 | 126.0 | $9.9400 |
Buyout purchase orders
| PO # | Vendor | Lines | Total Cost | Confirm |
|---|---|---|---|---|
| 61-84614 | Certified Pipe Service Houston, Inc. | 2 | $3000.00 | |
| 61-84838 | Womble Company, Inc. | 1 | $2505.00 |
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.