JD Fields & Company
Cost Sheet Review — 61-110330

Plains Oryx Permian Basin Pipeline LLC

← Back to SOE
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.

Selling Price (2 lines)

#Item / DescriptionQty (Footage)Unit PriceAmountFootage
1 ST-79347-11 — 4-1/2" OD X .337" WALL, ERW API 5L X52/X56 PSL-2, FBE 14-16 126.0 $89.8900 $11326.14
2 Pipe, line, TRANSITION -4.500 x 0.337 transitioned to 0.237 API5L PSL2 X52 ERW PEB SRL (10' in length) with 14-16 mils FBE inclusive of Acid Wash - taper bored at an angle between 1:4° minimum (1:4 slope) and 30° Maximum SEAH, KOREA 120.0 $89.8900 $10786.80

Cost Items

Stock pulled from inventory
Item #DescriptionFeetCostConfirm
ST-79347-11 4-1/2" OD X .337" WALL, ERW API 5L X52/X56 PSL-2, FBE 14-16 126.0 $9.9400
Buyout purchase orders
PO #VendorLinesTotal CostConfirm
61-84614 Certified Pipe Service Houston, Inc. 2 $3000.00
61-84838 Womble Company, Inc. 1 $2505.00
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.
{} {} {} {}