Cost Sheet Review — 61-110557
ACM WELL DRILLING
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the
cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again
to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not
everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.
Selling Price (2 lines)
| # | Item / Description | Qty (Footage) | Unit Price | Amount | Footage |
|---|---|---|---|---|---|
| 1 | buyout — 24" OD X .375" Wall ASTM A252 - SRL | 800.0 | $96.0000 | $76800.00 | |
| 2 | Freight — Hot Shot 8/14/26 | 1.0 | $3500.0000 | $3500.00 |
Cost Items
Stock pulled from inventory
| Item # | Description | Feet | Cost | Confirm |
|---|---|---|---|---|
| buyout | 24" OD X .375" Wall ASTM A252 - SRL | 800.0 | $82.3900 | |
| Freight | Hot Shot 8/14/26 | 1.0 | — |
Buyout purchase orders
| PO # | Vendor | Lines | Total Cost | Confirm |
|---|---|---|---|---|
| 61- | SAG Pipe LLC | 1 | $65912.00 |
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.