Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Outlook draft opened with the SOE and buyout PO(s) attached -- review before sending.
Documents are not being saved.
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Documents are NOT being saved. Nothing can be written into C:\Users\TBiggs\JD Fields & Co\Wortham Tower - Documents\Biggs\Trunkline Folders ([WinError 2] The system cannot find the file specified: 'C:\\Users\\TBiggs\\JD Fields & Co\\Wortham Tower - Documents\\Biggs\\Trunkline Folders\\.packettracker_write_test'). That folder is inside OneDrive, which is the usual cause: pause syncing, or set the documents folder to a plain local folder under Settings.
Change the documents folder
Cost Sheet Review โ 61-110290
Edgen Murray LLC
Before this goes out as an invoice, click to confirm the footage on every selling-price line below, and the
cost/footage on every cost item, against the real paperwork (BOL, tally, vendor invoice). Click a badge again
to un-check it if you need to. Nothing here is locked -- the button at the bottom works whether or not
everything above is checked.
✓ Everything's confirmed
Every line below has been checked against the real paperwork. Ready to generate.
Selling Price (1 line)
| # | Item / Description | Qty (Footage) | Unit Price | Amount | Footage |
|---|---|---|---|---|---|
| 1 | Buyout โ 24" OD .750" wall X65 DSAW JFE | 400.2 | $253.2200 | $101338.64 |
Cost Items
Stock pulled from inventory
| Item # | Description | Feet | Cost | Confirm |
|---|---|---|---|---|
| Buyout | 24" OD .750" wall X65 DSAW JFE | 400.2 | โ |
Buyout purchase orders
| PO # | Vendor | Lines | Total Cost | Confirm |
|---|---|---|---|---|
| 61-84535 | Sixgen | 1 | $52220.02 |
Other costed documents (loadout fees, local freight, etc.)
No costed documents included.